Immersive & themed experiences
Dark rides & immersive systems
Architecture, motion and content.
Discuss your project
Engineering perspective
Architecture, motion and content.
Flying theatres, AGV dark rides and multimedia experiences, integrating equipment, building, content and control interfaces.
Building height is not defined by seat count alone. Confirm motion envelopes, screens, projection, access and maintenance spaces.
Load data and utility interfaces are tied to the selected configuration. Equipment, structure and utilities require coordinated document versions.
Content, audio, effects and motion need a defined shared scope. Establish formats, languages, sequences and usage rights before integration.
| Systems | Flying theatres, dark rides and multimedia equipment |
|---|---|
| Coordination | Building, loads, motion and content |
| Capacity | According to seats and documented operating cycle |

Dark rides and flying theatres: the experience
Scenes, motion, ride journeys and equipment–space coordination.
System options and selection criteria
Swipe the table to view all criteria →
| Configuration | Application | Engineering criterion |
|---|---|---|
| Flying theatre | Synchronised motion, imagery and experience | Motion envelope and viewing geometry determine height, structure and maintenance requirements. |
| Dark ride and narrative journey | Vehicles, scenes, media and control | Define interfaces among routing, scenes, detection, operations and evacuation. |
| Multimedia and motion systems | Seating, projection, audio and effects as programmed | Align content rights, synchronisation, acoustics and environmental control. |
Inputs that define your project
- Building plans and sections
- Audience, seating and operation
- Content and intended usage rights
- Utilities and schedule
Interfaces to resolve
- Structure and equipment envelope
- Power, environmental services and networks
- Control, content and testing
Project documentation
- Agreed design inputs and criteria
- Drawings and interface schedule
- Fabrication and inspection documents
- Installation, testing and handover plan
Availability, detail and responsibilities are defined in the technical agreement.
Engineering questions
What should be confirmed before finalising the building?
Motion envelope, screen geometry, loads, clear height, evacuation, environmental control and replacement access. Coordinate these with the experience design.
Are media content and rights automatically included?
No. Define production or licensing, territories, languages, licence term, updates and control integration in the scope agreement.
Further perspectives
A flying theatre starts with the building too.
The next step starts with your requirements.
Location, intended use, site conditions and scope. The right inputs make a focused technical discussion possible.